2009
January
February
March
April
May
June
July
Ferriera Valsider spa production switches to prevalent part of hot rolled coils.
August
September
October
November
December
Ferriera Valsider spa obtains AIA (Complex Environment Authorization) in frame of Directive 96/61/CE Integrated Pollution Prevention and Control (IPPC).
2007
January
February
March
April
May
June
July
August
September
October
November
December
The heat treatment furnace revamping: treatment performance and normalized products quality improved.
2006
January
February
March
April
May
June
Metinvest BV becomes owner of the 70% of the shares of Ferriera Valsider.
July
August
September
New quality control lab put in operation.
October
November
December
2001
January
February
March
April
May
June
July
Ferriera Valsider Spa is founded as a result of hot rolling division transfer from SPS company. The 49% of the share capital was subscribed by Metinvest BV. At the same time new Bendotti (slab reheating) furnace is installed – reheating capacity 120-135 t/hour
August
September
the hot rolled coils plant starts-up (the installation began under SPS) with first HRC production